Snake River Energy is a proposed utility-scale solar and battery storage project on Bureau of Land Management public lands in Gooding and Lincoln Counties.

When approved, the project will:

  • Generate up to 1,000 megawatts of solar energy
  • Include up to 1,000 megawatts of battery energy storage

Snake River Energy would connect to the Idaho Power transmission system near the existing Midpoint Substation in Jerome County.

  • The application boundary is for 14,000 acres
  • Based on coordination with the BLM and grazing permittee input, the project location of the solar facility is intentionally proposed some distance away from Shoshone and Highway 93 to reduce visibility from the Sawtooth Scenic Byway.
  • Primary access is proposed from U.S. Highway 26, with existing roads used where practical

Based on BLM and grazing permittee input, the project scope has been adjusted to move the solar facility farther from Shoshone and Highway 93 to reduce visibility from the Sawtooth Scenic Byway.

Snake River Energy will work with the BLM on a full environmental review, which, among other areas, will evaluate water, wildlife, grazing, vegetation, cultural resources, recreation, roads, traffic, views, and soils.

Project Timeline

O4 2026

National Environmental Protection Act federal permitting process begins

Q3 2027

Target Bureau of Land Management decision on project

December 2027:

*Target construction start at project site

December 2030:

Target commercial operation

*Construction cannot begin until the required approvals and authorizations are in place. Snake River Energy is responsible for all aspects of the project, from construction through the end of its lifespan. This includes the decommissioning phase, which would remove all equipment, restore disturbed areas, and revegetate the site at the end of the project’s life.